Case studies

Two stories, told without names

Client names available on request under NDA.

Their other supplier ran short.

Situation
The customer bought this part from us and from one other supplier, and was counting on that supplier for the next delivery. The supplier ran short and could not deliver in the time the line needed. The customer called us.
At stake
About 2,000 engines a day. Their line builds around 2,000 engines a day, and without this one part it would have stopped.
What we did
The agreed delivery mode was road. We sent the parts by air and did not bill the freight.
Result
The line did not stop. We earned their trust as a dependable supplier, and their loyalty with it.
What it cost us
Air freight that cost more than the parts themselves.

Read the full story

The parts passed inspection. The assembly still failed.

Situation
Our parts met the customer's drawing, but their line kept having trouble assembling them.
At stake
Rejections on their assembly line.
What we did
We flew to their plant, sat with the team on the line and traced the root cause. Then we changed the part's design and our process to suit their assembly.
Result
The root cause was fixed and the assembly ran. We went in as a parts supplier and came out as their troubleshooter: the team that fixes what a drawing alone cannot.
What it cost us
Engineering time and travel, for a problem the drawing did not make ours.

Read the full story

Request for quotation

Send us the drawing.

We reply with a feasibility note within 2 working days for a part made to a standard, and within 5 working days for a custom part. PDF, DWG and STEP files accepted.

Or email the drawing to inquiry@photoray.co.in.