Case 02

The parts passed inspection. The assembly still failed.

Client names available on request under NDA.

Situation
Our parts met the customer's drawing, but their line kept having trouble assembling them.
At stake
Rejections on their assembly line.
What we did
We flew to their plant, sat with the team on the line and traced the root cause. Then we changed the part's design and our process to suit their assembly.
Result
The root cause was fixed and the assembly ran. We went in as a parts supplier and came out as their troubleshooter: the team that fixes what a drawing alone cannot.
What it cost us
Engineering time and travel, for a problem the drawing did not make ours.